By default, the "Check-out" tile on the home screen shows all contracts that need to be checked out within the specified period. By default, the contracts that should have been checked out during the past 30 days will be shown. 


If you wish to change the default period of the past 30 days, please contact us at support@proplanner.eu


Using the date filters and associated navigation buttons, you can customise the shown list of contracts to be checked out. This allows you to:

  • Change the period shown by changing the date fields (1)
  • Show only the contracts that need to be checked out today by clicking the "Today" button (2)
  • Show only the contracts that need to be checked out the next day by clicking the right arrow (3)
  • Show only the contracts that need to be checked out the previous day by clicking the left arrow (4)

It is important to note here that the buttons with the arrows (3 and 4) will only be available if the period shown is one day. 


The dates in the date fields will always show the period for which the contracts to be checked out are listed.